首页 | 本学科首页   官方微博 | 高级检索  
     

高压进洞方案在大梁峁特长公路隧道中的应用
引用本文:常伟. 高压进洞方案在大梁峁特长公路隧道中的应用[J]. 交通标准化, 2012, 0(2): 93-96
作者姓名:常伟
作者单位:中铁十二局集团第三工程有限公司,山西太原,030024
摘    要:大梁峁特长公路隧道采用了高压进洞方案,效果良好,隧道得以安全、顺利贯通。该实践进一步丰富了我国高速公路隧道的建设经验,对类似工程具有很好的借鉴作用。

关 键 词:公路  隧道  变压器  电压

Application of Cave Entering with High Voltage in Daliangmao Super-Long Tunnel
CHANG Wei. Application of Cave Entering with High Voltage in Daliangmao Super-Long Tunnel[J]. Communications Standardization, 2012, 0(2): 93-96
Authors:CHANG Wei
Affiliation:CHANG Wei (The 3rd Engineering Co., Ltd. of China Railway 12th Bureau Group, Taiyuan 030024, China)
Abstract:High voltage scheme is applied in cave entering of Daliangmao Super-long Tunnel, which brings good effect. The tunnel is got through safely and smoothly. The practice accumulates the experience of expressway tunnel construction in China, which can be consulted by similar engineering.
Keywords:highway  tunnel  transformer  voltage
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号