首页 | 本学科首页   官方微博 | 高级检索  
     检索      

G108线(太原段)勘察设计中地质灾害的应对
引用本文:梁文耀.G108线(太原段)勘察设计中地质灾害的应对[J].交通标准化,2012(2):75-77.
作者姓名:梁文耀
作者单位:山西省公路局太原分局,山西太原,030012
摘    要:近年来自然灾害对公路运营的影响趋于频繁,究其原因既有客观因素,也有主观因素。公路勘察不细、设计周期不足、施工方案不当等都是造成公路地质灾害的主要因素。在公路勘察、设计时,应针对地质灾害采取合理措施进行应对。

关 键 词:G108线  勘察设计  地质灾害  应对

Response to Geological Disasters in Survey and Design of G108 Taiyuan Section
HANG Wen-yao.Response to Geological Disasters in Survey and Design of G108 Taiyuan Section[J].Communications Standardization,2012(2):75-77.
Authors:HANG Wen-yao
Institution:LIANG Wen-yao (Shanxi Highway Bureau, Taiyuan Branch, Taiyuan 030012, China)
Abstract:In recent years, the impact of natural disasters on highway operation tends to be frequent. There are objective factors and subjective factors. The survey is not careful enough, the design period is insufficient, the construction program is improper are the main factors causing geological disasters of highway. During highway survey and design, the reasonable measures should be adopted to dispose the geological disasters.
Keywords:G108 Line  survey and design  geological disasters  response
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号