首页 | 本学科首页   官方微博 | 高级检索  
     

京郑既有线CTCS2级信号系统方案研究
引用本文:裘韧. 京郑既有线CTCS2级信号系统方案研究[J]. 电气化铁道, 2006, 0(2): 42-44,50
作者姓名:裘韧
作者单位:北京电铁通信信号勘测设计院
摘    要:分析了京郑线信号系统既有低频信息的特殊性,提出了在京郑线提速200km/h,车载设备能够兼容其他提速200km/h线路的CTCS2解决方案,工程可实施性强。

关 键 词:既有线  CTCS2  方案  研究

CTCS2 Level Signal System Scheme Study in Existing Beijng-Zhengzhou Railway
Qiu Ren. CTCS2 Level Signal System Scheme Study in Existing Beijng-Zhengzhou Railway[J]. Electric Railway, 2006, 0(2): 42-44,50
Authors:Qiu Ren
Abstract:Analyzes the existing low-frequency information particularity in signal system of Beijng-Zhengzhou railway line, puts forward the CTCS2 scheme that the train-borne equipment for Beijing-Zhengzhou railway line with speed raised to 200 km/h is able to be compatible with that of other lines with speed raised to 200km/h; the scheme is practical in implementation.
Keywords:the existing railway line  CTCS2  scheme  study  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号