二滩水电站水垫塘6.3/0.4kV排水工程设计综述
引用本文:段绪芳.二滩水电站水垫塘6.3/0.4kV排水工程设计综述[J].机电设备,2009,26(1):37-40.
作者姓名:段绪芳
作者单位:二滩水力发电厂,攀枝花,617000
摘    要:为了对水垫塘底坎进行检查、维护,二滩水电站拟增设4×220kW水泵对检查段进行排水。介绍了二滩水垫塘6.3/0.4kV排水变电站动力电缆选型、开关配置及变压器容量计算,并针对实际,切入要点,提出了设计平台。

关 键 词:工作电流  经济密度电流  短路电流  电压损失  YJV动力电缆

Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
DUAN Xu-fang.Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station[J].Mechanical and Electrical Equipment,2009,26(1):37-40.
Authors:DUAN Xu-fang
Institution:Ertan Hydropower Plant;Panzhihua 617000;China
Abstract:To check-up and stick up for the bottom of the plunge-pool at Ertan Hydropower Station,Plan to add four-220kW water pump for draining.In this paper associated with choosing power cable and switch and transformer.In allusion to practice,educed applied flat roof.
Keywords:working current  economy and density current  short circuit current  voltage loss  power cable of YJV  