首页 | 本学科首页   官方微博 | 高级检索  
     

论述风积沙路基施工工艺及质量控制措施
引用本文:韩燕梅. 论述风积沙路基施工工艺及质量控制措施[J]. 黑龙江交通科技, 2012, 0(8): 45-45,47
作者姓名:韩燕梅
作者单位:邯郸市交通运输局公路工程一处
摘    要:风积沙路基施工很复杂,必须严格按照风积沙路基施工工艺进行路基的填筑,并在施工中可能出现的问题,采取合理有效方案去解决,确保风积沙路基的施工质量并保证工程施工的进度要求。为此,在这里对风积沙填筑路基的施工工艺及其质量控制措施进行了分析。

关 键 词:风积沙  路基  施工  工艺  质量措施

The aeolian sand roadbed construction technology and quality control measures
HAN Yan-mei. The aeolian sand roadbed construction technology and quality control measures[J]. Communications Science and Technology Heilongjiang, 2012, 0(8): 45-45,47
Authors:HAN Yan-mei
Affiliation:HAN Yan-mei
Abstract:The aeolian sand roadbed construction is complex which must be in strict accordance with the aeolian sand roadbed construction technology for sugared filling.The problems may arise in construction.Take reasonable and effective solutions to solve,ensure the aeolian sand roadbed construction quality and ensure the construction schedule.To this end,here on aeolian sand filling roadbed construction technology and quality control measures were analyzed.
Keywords:aeolian sand  roadbed  construction  technology  quality measures
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号