首页 | 本学科首页   官方微博 | 高级检索  
     检索      

连续梁预应力部分施工中的关键工序研究
引用本文:黄君洲.连续梁预应力部分施工中的关键工序研究[J].城市道桥与防洪,2012(10):83-85.
作者姓名:黄君洲
作者单位:中铁二十一局集团第四工程有限公司,甘肃兰州730000
摘    要:连续梁桥是中等跨径桥梁中常用的一种桥梁结构,预应力混凝土连续梁桥是其主要结构形式,它具有接缝少、刚度好、行车平顺舒适等优点,其中,预应力是连续梁施工的重点和难点。以新建太中银铁路跨石中高速公路特大桥连续梁施工为例,对影响预应力部分施工的关键要素进行简要阐述。

关 键 词:连续梁  预应力  施工  关键工序

Study of Critical Procedure in Pre-stressing Construction of Continuous Beam
Huang Junzhou.Study of Critical Procedure in Pre-stressing Construction of Continuous Beam[J].Urban Roads Bridges & Flood Control,2012(10):83-85.
Authors:Huang Junzhou
Institution:Huang Junzhou
Abstract:The continuous beam bridge is a common structure of medium-span bridge.The prestressed concrete continuous beam bridge is its main structure form.It has the advantages of fewer joints,good stiffness,driving smoothness and comfort,in which the prestressing is important and difficult in the construction of continuous beam.Taking the construction of continuous girder of the over-long bridge for the newly built Taizhongyin Railway spanning Shizhong Expressway as an example,the article briefly sets forth the key elements to affect the pre-stressing construction.
Keywords:continuous beam  prestressing  construction  key procedure
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号