大跨径斜拉桥换索工程实践
引用本文:袁兰兰.大跨径斜拉桥换索工程实践[J].城市道桥与防洪,2010(12):109-112.
作者姓名:袁兰兰
作者单位:舟山市大陆连岛工程指挥部,浙江舟山,316000
摘    要:该文以一座7跨连续半漂浮体系混合式斜拉桥为实例,其主跨580 m,为扁平流线型钢箱梁,全桥共有斜拉索168根,斜拉索采用梁上销铰锚固,塔上单端张拉方式。在运营检查中发现斜拉索PE破损,为保证大桥的安全使用性能,必须对该索进行更换。该文对该桥换索的施工及监测等过程进行了阐述。

关 键 词:斜拉桥  单根换索  施工  监控  材料

Practice of Cable Replacement Project for Long Span Cable-stayed Bridge
Yuan Lanlan.Practice of Cable Replacement Project for Long Span Cable-stayed Bridge[J].Urban Roads Bridges & Flood Control,2010(12):109-112.
Authors:Yuan Lanlan
Abstract:The article takes the system of seven-span continuous semi-floating combined cable-stayed bridge as a case.The main span of this bridge is 580 m.Its beam is the flat streamlined steel box one.There are totally 168 stayed cables,which are anchored to the beam by pin hinges,and the cables have been tensioned at the single end of the pylon.It is necessary to replace this cable because of its damaged PE cable found in the operation in order to assure its safe service performance.The article sets forth the construction and monitoring processes of cable replacing for this bridge.
Keywords:cable-stayed bridge  replacement of single cable  construction  monitoring  material