首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈如何提高TB880E掘进施工效率
引用本文:陈小冬.浅谈如何提高TB880E掘进施工效率[J].铁道建筑技术,2009(11):27-30.
作者姓名:陈小冬
作者单位:中铁十八局集团有限公司隧道工程公司,天津,300222
摘    要:结合吐库二线铁路中天山隧道TBM施工实践,对于影响TB880E型隧道掘进机掘进效率的因素进行了分析,同时提出了应对措施,以期在确保工程质量与施工安全的前提下,提高掘进效率,可供相关工程借鉴。

关 键 词:TBM  掘进效率  影响因素  应对措施

How to Improve the Efficiency of Tunneling Construction by TB880E
Chen Xiaodong.How to Improve the Efficiency of Tunneling Construction by TB880E[J].Railway Construction Technology,2009(11):27-30.
Authors:Chen Xiaodong
Institution:Chen Xiaodong (China Railway 18th Bureau Group Co. Ltd. , Tianjin 300222, China)
Abstract:Based on Zhongtianshan Tunnel of second-line railway of Tu lufan-Ku erie in southern Xinjiang construction practices that affect TB880E-type TBM boring efficiency factors are analyzed, and put forward measures to cope with a view to ensure project quality and construction safety under the premise of improving the efficiency of tunneling, associated works for reference.
Keywords:TBM
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号