首页 | 本学科首页   官方微博 | 高级检索  
     检索      

温度荷载对钢管混凝土拱桥拱肋安装线形的影响分析
引用本文:倪梓媛.温度荷载对钢管混凝土拱桥拱肋安装线形的影响分析[J].铁道建筑技术,2009(9):139-142,151.
作者姓名:倪梓媛
作者单位:中铁十三局集团第一工程有限公司,辽宁大连,116033
摘    要:大跨钢管混凝土拱桥钢管拱肋随着节段增加、悬臂长度加长、外界环境温度变化对拱肋安装线形的影响越显著,给线形控制带来诸多困难。介绍支井河特大桥钢管拱肋安装施工中温度荷载对拱肋安装线形的影响分析,并提出相关的安装对策。

关 键 词:温度荷载  钢管拱肋  拱桥线形  影响分析

The Analysis of the Impact of Temperature Load on the Arch Rib Alignment of the Concrete-filled Steel Tube Arch Bridge
Ni Ziyuan.The Analysis of the Impact of Temperature Load on the Arch Rib Alignment of the Concrete-filled Steel Tube Arch Bridge[J].Railway Construction Technology,2009(9):139-142,151.
Authors:Ni Ziyuan
Institution:Ni Ziyuan (China Railway 13^th Bureau Group Co. Ltd. , Dalian 116033, China)
Abstract:As the segments of the steel tube arch ribs of huge-span concrete-filled steel tub arch bridges increase, the cantilever is lengthened. The external environment temperature change has a more apparent influence on the arch rib alignment, which brings many difficulties to the alignment control. The paper introduces the analysis and relative installation countermeasures of the influence of temperature load on the arch rib alignment.
Keywords:temperature load  steel tube arch rib  arch bridge alignment  influence
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号