基于拱盖法的超大断面暗挖隧道洞内逆作工法关键技术研究
引用本文:邹光炯,彭 辉,周 捷. 基于拱盖法的超大断面暗挖隧道洞内逆作工法关键技术研究[J]. 都市快轨交通, 2021, 34(6): 113-119. DOI: 10.3969/j.issn.1672-6073.2021.06.017
作者姓名:邹光炯  彭 辉  周 捷
作者单位:重庆市轨道交通设计研究院有限责任公司,重庆401122
摘    要:基于拱盖法的超大断面暗挖隧道洞内逆作工法是借鉴"明挖逆作"的施工理念,采用双侧壁导坑法或其他分部开挖工法完成隧道拱部开挖与二衬拱盖施工,在拱盖形成后,隧道中下部断面通过永临结合的支锚体系和合理的施工组织,通过开挖支护与衬砌结构的逆作法施工减小工程风险,降低施工难度;在隧道中下部断面施工阶段,沿隧道纵向、横向、竖向进行三...

关 键 词:轨道交通  软质岩  拱盖法  超大断面  洞内逆作工法  永临结合

Key Technology of Top-down Construction Method for Bored Super- large Section Tunnels Based on Arch-cover Method in Soft Rock Areas
ZOU Guangjiong,PENG Hui,ZHOU Jie. Key Technology of Top-down Construction Method for Bored Super- large Section Tunnels Based on Arch-cover Method in Soft Rock Areas[J]. Urban Rapid Rail Transit, 2021, 34(6): 113-119. DOI: 10.3969/j.issn.1672-6073.2021.06.017
Authors:ZOU Guangjiong  PENG Hui  ZHOU Jie
Affiliation:Chongqing Rail Transit Design and Research Institute Co., Ltd.
Abstract:The top-down construction method for a bored super-large section tunnel based on the arch-cover method learns from the top-down method used in open-cut structure constructions, which applies the double-side-drift method or other section excavation method to excavate and complete the arch cover secondary lining. After the arch cover is finished, the middle and bottom of the tunnel section will use combined temporary and permanent supports, reasonable construction organization, and cover-and-cut bottom-up methods to reduce engineering risks and difficulties. During the construction phase of the middle and bottom of the tunnel section, the construction organization will develop in three dimensions, offering sufficient space for tunnel construction. This construction method was successfully applied to the Minan Avenue station in the Chongqing rail transit loop line. This project application proved that this construction method can reduce engineering risk and difficulty, enhance construction efficiency, reduce project funding, and shorten the construction period.
Keywords:rail transit   soft rock   arch-cover method   super-large section tunnel   top-down construction method   combined temporary and permanent supports