首页 | 本学科首页   官方微博 | 高级检索  
     检索      

天津海河沉管隧道横断面方案选择
引用本文:袁有为,王艳宁,史庆春.天津海河沉管隧道横断面方案选择[J].城市道桥与防洪,2013(2):51-53,66,7.
作者姓名:袁有为  王艳宁  史庆春
作者单位:同济大学;天津市市政工程设计研究院
摘    要:随着我国沉管法修建隧道技术的发展,越来越多的水下隧道采用沉管法施工,结合工程实际,通过各种方案进行综合比较,论述了不同横断面方案的适用性及其优缺点,以确定经济、合理的横断面方案。

关 键 词:沉管隧道  横断面  方案选择

Selection of Immersed Tube Tunnel Cross-sectional Scheme for Tianjin Haihe River
Yuan Youwei,Wang Yanning,Shi Qingchun.Selection of Immersed Tube Tunnel Cross-sectional Scheme for Tianjin Haihe River[J].Urban Roads Bridges & Flood Control,2013(2):51-53,66,7.
Authors:Yuan Youwei  Wang Yanning  Shi Qingchun
Institution:Yuan Youwei,Wang Yanning,Shi Qingchun
Abstract:With the development of the immersed tube tunnel construction technology in China,more and more underwater tunnel is constructed by the immersed tube process.Combined with the engineering practices,and comprehensively compared with various schemes,the article discusses the applicability,advantages and disadvantages of the different cross-sectional schemes so as to define the economical and reasonable cross-sectional scheme.
Keywords:immersed tube tunnel  cross section  scheme selection
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号