丹东电厂蓄水库淤积预报和施工验证
引用本文:吴达开.丹东电厂蓄水库淤积预报和施工验证[J].港工技术,2000(2):1-12.
作者姓名:吴达开
作者单位:天津港湾工程研究所,300222
摘    要:简要介绍以著名的潮流模型S21HD为基础,用新建的依赖于原观资料的全沙冲淤概化模型,对丹东电厂蓄水库设计方案进行了回淤计算;引述了相应的波浪模型试验结构和浪、流联合作用淤积预报结果。经过对库区开挖主要阶段施工资料的分析与验证得知:所建立的冲淤概化模型和整个淤积预报都是成功的。

关 键 词:电厂蓄水库  冲淤概化模型  淤积预报  施工验证

Sedimentation Forecast for the Reservoir of Dandong Power Plant and Proof of Construction
Wu Dakai.Sedimentation Forecast for the Reservoir of Dandong Power Plant and Proof of Construction[J].Port Engineering Technology,2000(2):1-12.
Authors:Wu Dakai
Institution:Wu Dakai ;(Tianjin Harbour Engineering Institute 300222)
Abstract:It was introduced in the paper on the basis of the famous tide model of S21HD, the sediment calulation for the design proposal of the Reservoir of Dandong Power Plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted. It was obtained through the analysis and verification of the construction data of the main step for reservoir excavation that the generalized model of sediment set up and the all the forecast resuits of sediment are successful.
Keywords:reservoir of power plant  generalized model of sediment  sediment forecast  construction verificiation