芜湖长江三桥施工浮桥设计
引用本文:何明辉,刘爱林,胡雄伟.芜湖长江三桥施工浮桥设计[J].世界桥梁,2021,49(2):25-30.
作者姓名:何明辉  刘爱林  胡雄伟
作者单位:中铁大桥局集团有限公司,湖北武汉430050;桥梁结构健康与安全国家重点实验室,湖北武汉430034;中铁大桥局商合杭铁路芜湖长江公铁大桥项目经理部,安徽芜湖241001
摘    要:芜湖长江三桥主桥桥墩均位于水中,需搭设施工浮桥用于水中墩施工混凝土输送及人员通行.芜湖侧浮桥布置于5号墩和3号桥塔墩之间,长272.3 m,跨径布置为(35.5+6×36+18)m,桥面净宽3.3m.浮桥设计采用“浮箱+贝雷梁”结构,横向布置4榀贝雷梁,桥面板采用I10@750 mm分配梁+6 mm厚花纹钢板组成,桥面...

关 键 词:桥梁工程  施工浮桥  浮箱  贝雷梁  锚碇系统  预偏量  设计

Design of Floating Bridge Built in Construction of Third Wuhu Changjiang River Bridge
HE Ming-hui,LIU Ai-lin,HU Xiong-wei.Design of Floating Bridge Built in Construction of Third Wuhu Changjiang River Bridge[J].World Bridges,2021,49(2):25-30.
Authors:HE Ming-hui  LIU Ai-lin  HU Xiong-wei
Institution:(China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China;State Key Laboratory for Health and Safety of Bridge Structures,Wuhan 430034,China;Project Management Team of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway,China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhu 241001,China)
Abstract:All the piers of the main bridge of Third Wuhu Changjiang River Bridge are river piers.During the construction of these piers,floating bridges had to be built as personnel access and for the ease of concrete transportation.The Wuhu-side floating bridge was built between pier No.5 and pylon pier No.3,which measured 272.3 m long and 3.3 m wide,with span arrangement of 35.5 m,6×36 m and 18 m.The main components of the floating bridge incorporated the floating boxes and bailey trusses,along the width,four bailey trusses were installed side by side.The deck system was formed by distribution beams(I10@750 mm)and 6 mm-thick checkered plates.Concrete pump pipes were placed along the two sides of the deck,and the space in between was footway.A number of 7 floating boxes were used,each measuring 12 m long and 6.1 m wide.The floating boxes were linked by three steel tubes with dimensions of?2000 mm×8 mm.At the two ends of the floating box,the steel tubes were cut to have pointed ends so as to reduce flow force.The central floating box was 24 m long,on both the upstream and downstream sides of which,concrete anchorages were built to improve the global stability of the floating bridge.In addition,the central floating box was also set with pre-displacement along the flow direction to ensure the safety and stability of the floating bridge during construction.When the water level showed fluctuation,the anchor ropes could be loosened or tautened for the same purpose.
Keywords:bridge engineering  floating bridge to ease construction  floating box  bailey truss  anchorage system  pre-displacement  design