首页 | 本学科首页   官方微博 | 高级检索  
     

南京浦仪公路西段跨江大桥主桥施工技术
引用本文:周望. 南京浦仪公路西段跨江大桥主桥施工技术[J]. 世界桥梁, 2021, 49(1): 7-13
作者姓名:周望
作者单位:南京市公共工程建设中心,江苏南京210019
摘    要:南京浦仪公路西段跨江大桥主桥为主跨500 m的钢箱梁斜拉桥,采用钻孔桩基础,桥塔为大断面独柱形钢塔,通过高强拉杆与承台和塔座连接,主梁分左、右两幅布置.钻孔桩基础采取搭设钢平台的方式施工;钢塔采用大型浮吊和塔吊安装;钢箱梁采取边跨浮吊高支架存梁十中跨桥面吊机单悬臂拼装的方式施工;斜拉索安装采用塔端挂设、梁端压锚、梁端张...

关 键 词:斜拉桥  钻孔桩  钢塔  钢箱梁  斜拉索  施工技术

Construction Techniques for Main Bridge of West River-Crossing Section of Puyi Highway in Nanjing
ZHOU WANG. Construction Techniques for Main Bridge of West River-Crossing Section of Puyi Highway in Nanjing[J]. World Bridges, 2021, 49(1): 7-13
Authors:ZHOU WANG
Affiliation:(Nanjing Public Works Construction Center,Nanjing 210009,China)
Abstract:The main bridge of west river-crossing section of Puyi Highway in Nanjing is a steel box girder cable-stayed bridge with a main span of 500 m.The bridge consists of identical left and right structures.The pylons are large-cross-section and mono-columned steel structures supported by bored pile foundations,the pedestals of which are connected with the pile caps by high-strength rods.Steel platforms were installed to ease the bored pile foundation construction.The steel pylons were erected using the large floating crane and the tower crane.The steel box girders in the side spans were first stored on high-rise scaffolds and then hoisted by floating crane,while the steel box girders in the central span was assembled in a single cantilever way using deck crane.The stay cables were stretched down from the pylons,anchored to the main girder and tensioned.Given that the bored piles had to be driven through silty mudstones,the milled-tooth bits were selected,since this kind of bits are not easy to be stuck by mud.After the quality of the bored piles was verified,the steel platforms were demolished and cofferdams were installed.The positioning process of the first pylon section was simulated by BIM,and full-scale model test was also conducted.To ensure the compactness of the cementitious mortar,vertical agitators were used for mixing and blending.The central span was closed by using the natural temperature difference closure method,which required no splices and could assure the installation precision and geometry of the completed bridge.
Keywords:cable-stayed bridge  bored pile  steel pylon  steel box girder  stay cable  construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号