新宝塔山隧道临近既有线施工技术
引用本文:李寿福,赵侃,陈德国.新宝塔山隧道临近既有线施工技术[J].铁道建筑技术,2010(3):109-112.
作者姓名:李寿福  赵侃  陈德国
作者单位:中铁二十一局集团有限公司,兰州,730000
摘    要:新宝塔山隧道洞身穿越土石分界地层和水平层里的砂岩页岩互层,出口段邻近既有线,最小线间距13.8m。主要介绍了隧道临近既有线、穿越土石分界条件下的施工技术,以期对类似工程提供借鉴价值。

关 键 词:隧道施工  临近既有线  不良地质

Construction Technologies of New Baota Mount Tunnel Adjacent to Existing Lines
Li Shou fu,Zhao Kan,Chen Deguo.Construction Technologies of New Baota Mount Tunnel Adjacent to Existing Lines[J].Railway Construction Technology,2010(3):109-112.
Authors:Li Shou fu  Zhao Kan  Chen Deguo
Institution:Li Shou fu,Zhao Kan,Chen Deguo(China Railway 21th Bureau Group Co. Ltd.,Lanzhou 730000,China)
Abstract:New Baota Mount Tunnel goes through the layer separating soil and stones, and sandstone and shale interbed in the transverse layer. Its exit is adjacent to existing lines, with a minimum distance 13.8 m. The technologies of tunnel construction near exiting lines and going through soil and stone separating area are introduced in this paper, which can be reference to similar projects.
Keywords:tunnel contruction  adjacent to the existing line  construction  