首页 | 本学科首页   官方微博 | 高级检索  
     

如何降低建设项目施工阶段的工程成本
引用本文:张联峰. 如何降低建设项目施工阶段的工程成本[J]. 隧道建设, 2006, 26(6): 95-97
作者姓名:张联峰
作者单位:中铁隧道集团股份公司二分公司
摘    要:工程成本控制主要是放在内部管理上,特别是直接工程费和工期的有效控制,其次外部的市场因素和施工阶段的变更索赔也是着重考虑的一个方面。结合近几年所经历过的工程盈亏情况谈谈如何降低建设项目施工阶段的工程成本。

关 键 词:   建设项目 施工阶段 工程成本  
收稿时间:2005-06-22
修稿时间:2005-06-22

Discussions on Project Cost Control during Construction Period
ZHANG Lian-feng. Discussions on Project Cost Control during Construction Period[J]. Tunnel Construction, 2006, 26(6): 95-97
Authors:ZHANG Lian-feng
Affiliation:China Railway Tunnel Joint Stock Co., Ltd
Abstract:The top emphasis of the project cost control should be placed on internal management, especially on the effective control of the direct cost and construction period. Furthermore, external factors of the construction market, changes of works and claims should also be considered in the project cost control. In this article, the author, based on his experience, makes discussions on the project cost control during construction period.
Keywords:construction project   construction period   project cost
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号