首页 | 本学科首页   官方微博 | 高级检索  
     

鄱阳湖特大桥单壁吊箱围堰设计与施工
引用本文:邹显华 陈洪华. 鄱阳湖特大桥单壁吊箱围堰设计与施工[J]. 桥梁建设, 2007, 0(A01): 100-102,108
作者姓名:邹显华 陈洪华
作者单位:江西省公路机械工程局,江西南昌330000
摘    要:鄱阳湖特大桥主桥墩基础承台为高桩大体积混凝土结构,介绍基础施工采用的单壁钢吊箱围堰方案。

关 键 词:钢吊箱 围堰 桥梁施工 设计
文章编号:1003-4722(2007)S1-0100-03
修稿时间:2007-04-25

Design and Construction of Single-Wall Steel Boxed Cofferdams for Poyang Lake Bridge
ZOU Xian-hua , CHEN Hong-hua. Design and Construction of Single-Wall Steel Boxed Cofferdams for Poyang Lake Bridge[J]. Bridge Construction, 2007, 0(A01): 100-102,108
Authors:ZOU Xian-hua    CHEN Hong-hua
Affiliation:Administration of Highway and Mechanical Engineering, Jiangxi Province, Nanchang 330000, China
Abstract:The pile caps of the main bridge pier foundations of Poyang Lake Bridge are of elevated piles and massive concrete structures. In this paper, the single-wall steel boxed cofferdam scheme adopted for the construction of the foundations is dealt with.
Keywords:steel box   cofferdam   bridge construction   design
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号