港珠澳大桥超大断面隧道混凝土裂缝控制技术
引用本文:刘可心,吴 柯,刘豪雨. 港珠澳大桥超大断面隧道混凝土裂缝控制技术[J]. 水运工程, 2015, 0(8): 139-143
作者姓名:刘可心  吴 柯  刘豪雨
作者单位:中交武汉港湾工程设计研究院有限公司,湖北 武汉 430040;海工结构新材料及维护加固技术湖北省重点实验室,湖北 武汉 430040,中交武汉港湾工程设计研究院有限公司,湖北 武汉 430040;海工结构新材料及维护加固技术湖北省重点实验室,湖北 武汉 430040,中交武汉港湾工程设计研究院有限公司,湖北 武汉 430040;海工结构新材料及维护加固技术湖北省重点实验室,湖北 武汉 430040
摘    要:港珠澳大桥岛隧工程超大断面隧道混凝土包括预制沉管混凝土和人工岛现浇隧道混凝土,具有强度高、结构尺寸大、服役环境恶劣、控裂要求高且难度大等特点。其中预制沉管采用工厂法预制,全断面浇筑,采取片冰和制冷水拌合混凝土、喷雾养护等温控措施;人工岛隧道混凝土现场浇筑,采取合理分段分层、冷却水管、补偿收缩混凝土等温控措施。从施工现场情况来看,均未出现有害温度裂缝,温控效果良好,达到了预期的温控目标。

关 键 词:超大断面;预制沉管;现浇结构;人工岛;温度裂缝;控制技术;补偿收缩

Crack control technology for concrete of super-large section tube of Hong Kong-Zhuhai-Macao bridge
LIU Ke-xin,WU Ke and LIU Hao-yu. Crack control technology for concrete of super-large section tube of Hong Kong-Zhuhai-Macao bridge[J]. Port & Waterway Engineering, 2015, 0(8): 139-143
Authors:LIU Ke-xin  WU Ke  LIU Hao-yu
Affiliation:CCCC Wuhan Harbor Engineering Design & Research Institute Co.,Ltd.,Wuhan 430040,China;Hubei Key Lab of Advanced Materials and Reinforcement Technology Research for Marine Environment Structures,Wuhan 430040,China,CCCC Wuhan Harbor Engineering Design & Research Institute Co.,Ltd.,Wuhan 430040,China;Hubei Key Lab of Advanced Materials and Reinforcement Technology Research for Marine Environment Structures,Wuhan 430040,China and CCCC Wuhan Harbor Engineering Design & Research Institute Co.,Ltd.,Wuhan 430040,China;Hubei Key Lab of Advanced Materials and Reinforcement Technology Research for Marine Environment Structures,Wuhan 430040,China
Abstract:As the high concrete strength,large size andsevere service environment for super-large section tunnel which includes the precast immersed tube and the cast-in-suit tunnel in the artificial island of Hong Kong-Zhuhai-Macao bridge,crack control of concrete is difficult.Harmful cracks can be controlled effectively by a series of treatment measures during the construction period such as precasting in the factory,one-piece casting,controlling concrete raw material temperature,mixing concrete with ice shavings and cooling water,setting up automatic curing system for the precast immersed tube and reasonable layered and segmented,water pipe cooling,compensating contraction concrete for the cast-in-situ tunnel.Moreover,the harmful crack does not appear in both the precast immersed tube and the cast-in-situ tunnel appear and the prospective objective of temperature control is achieved.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文