盾构隧道穿越湘江溶洞区工程风险分析及应对措施探讨
引用本文:黎新亮.盾构隧道穿越湘江溶洞区工程风险分析及应对措施探讨[J].铁道标准设计通讯,2014(2):64-69.
作者姓名:黎新亮
作者单位:;1.中铁工程设计咨询集团有限公司
摘    要:结合长沙地铁3号线阜埠河路站—书院路站区间工程,为确保盾构隧道安全穿越湘江溶洞区,通过优化具体设计方案,分别从线路平面设置,盾构机选型及设计,溶洞江面处理方案及施工工期方面进行探讨,提出合理的线路平面设计和溶洞江面处理方案,为后续设计及施工提供参考。

关 键 词:盾构隧道  江底溶洞  工程风险  应对措施

Analysis and Countermeasures on Engineering Risk of Shield Tunnel Passing through Carst Cave Zone of Xiangjiang River
Institution:,China Railway Engineering Consulting Group Co. ,Ltd.
Abstract:In this paper,the project of Fubuhelu-Shuyuanlu section of Changsha Metro line 3 was taken as the research object. In order to ensure the safety of the shield tunnel passing through the carst cave zone of Xiangjiang River,the specific design scheme was optimized,and relevant issues were discussed, including the route plane design,type selection and shield machine design,river surface treatment above the carst cave,and the construction period. Finally,the reasonable route plane design scheme and river surface treatment scheme were put forward in this paper,serving as reference for subsequent design and construction.
Keywords:shield tunnel  carst cave underneath a river  engineering risk  countermeasure