下穿高层建筑特大跨度超大断面偏压隧道施工方法研究
引用本文:张学富,刘佳祥,丁燕平,陈俊涛,余元全.下穿高层建筑特大跨度超大断面偏压隧道施工方法研究[J].铁道学报,2012,34(5):107-113.
作者姓名:张学富  刘佳祥  丁燕平  陈俊涛  余元全
作者单位:重庆交通大学土木建筑学院,重庆,400074
基金项目:国家自然科学基金,重庆市建设科技项目
摘    要:结合重庆市轨道交通3号线下穿高层建筑特大跨度超大断面隧道工程,对其采用双侧壁导坑主楼侧先开挖、双侧壁导坑裙楼侧先开挖、单侧壁导坑主楼侧先开挖、单侧壁导坑裙楼侧先开挖等4种施工方法条件下全过程进行弹塑性数值仿真分析。结果表明:对于下穿高层建筑特大跨度超大断面隧道,在支护、支撑措施合理情况下,采用上台阶单侧壁导坑法能够满足变形和受力要求;隧道地表存在不对称荷载时采用双(单)侧壁导坑法施工,先开挖地表荷载较小侧导洞优于先开挖地表荷载较大一侧导洞。研究成果可供类似工程参考。

关 键 词:下穿高层建筑物  特大跨度、超大断面  施工方法  数值模拟

Methods for Excavation of Tunnel under Biased Loading with Super-large Span and Super-large Section Passing under High-rise Building
ZHANG Xue-fu , LIU Jia-xiang , DING Yan-ping , CHEN Jun-tao , YU Yuan-quan.Methods for Excavation of Tunnel under Biased Loading with Super-large Span and Super-large Section Passing under High-rise Building[J].Journal of the China railway Society,2012,34(5):107-113.
Authors:ZHANG Xue-fu  LIU Jia-xiang  DING Yan-ping  CHEN Jun-tao  YU Yuan-quan
Institution:(College of Civil and Architectural Engineering,Chongqing Jiaotong University,Chongqing 400074,China)
Abstract:In order to find out the speeded-up process of excavating tunnels with super-large spans and super-large sections passing under high-rise buildings,the underground industry and Trade Station of Chongqing Rail Transit Line 3 was supposed to be excavated with four methods and elastic-plastic numerical simulations were made for all the complete processes of construction accordingly.The four excavation methods are respectively the double-sided drift excavation method with first excavation on the main-building side,the double-sided drift excavation method with first excavation on the apron-building side,the single-sided drift excavation method with first upstep excavation on the main-building side and the single-sided drift excavation method with first upstep excavation on the apron-building side.The main building is the Industry and Trade Building with 22 storeys.The simulated results show as follows: With respect to super-large span and super-large section tunnels passing under high-rise buildings,the single-sided drift upstep excavation method can satisfy the deforming and stressing requirements when rational strutting and supporting measures are taken;when unsymmetrical ground surface loading exists,the double-sided drift excavation method and the single-sided drift excavation method way be adopted,and first drift excavation on the side of small loading is superior to first drift excavation on the side of large loading.The research results provide reference to similar engineering projects.
Keywords:underpass high-rise building  super-large span and super-large section  construction method  numerical simulation