首页 | 本学科首页   官方微博 | 高级检索  
     检索      

满堂支架现浇箱梁监理过程的控制
引用本文:林旭东,施茂松,代磊.满堂支架现浇箱梁监理过程的控制[J].广东公路交通,2011(1):39-42.
作者姓名:林旭东  施茂松  代磊
作者单位:广东华路交通科技有限公司;
摘    要:以国道主干线广州绕城公路南段第二监理合同段的满堂支架现浇箱梁为例,介绍了监理方案审查的流程和内容,给出了关键环节的控制,提出了过程控制中的一些重要细节,明确了满堂支架现浇箱梁监理的重点。

关 键 词:满堂支架  监理  控制

Supervision Control for Cast-in-place Box Girder with Full Falsework
LIN Xu-dong,SHI Mao-song,DAI Lei.Supervision Control for Cast-in-place Box Girder with Full Falsework[J].Guangdong Highway Communications,2011(1):39-42.
Authors:LIN Xu-dong  SHI Mao-song  DAI Lei
Institution:LIN Xu-dong,SHI Mao-song,DAI Lei(Guangdong Hualu Transport Technology Co.,Ltd.,Guangzhou,510420)
Abstract:Taking the cast-in-place box girder with full falsework at No.2 Supervision Contract of Secondary Southern Guangzhou Ring Expressway as example,this paper has introduced the technological process and content of supervision inspection,has brought forward the control of key links and some important details of process control,and has clarified key points of supervision for cast-in-place box girder with full falsework.
Keywords:full falsework  supervision  control  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号