首页 | 本学科首页   官方微博 | 高级检索  
     

塑料套管混凝土桩加固公路软基沉降性状有限元分析
引用本文:林飞,陈永辉,周星德. 塑料套管混凝土桩加固公路软基沉降性状有限元分析[J]. 现代交通技术, 2010, 7(3): 8-11
作者姓名:林飞  陈永辉  周星德
作者单位:江苏省交通规划设计院有限公司,江苏,南京,210005
摘    要:为了研究塑料套管混凝土桩(TC)桩加固公路软基的加固机理和变形特性,采用有限元方法分析了桩长、桩间距、填土高度对路基沉降的影响。TC桩未打穿软土层时,沉降较大,为减少沉降及工后沉降,TC桩宜打穿软土层进入相对持力层0.5-1.0m。TC桩桩端为相对硬土层时,调节桩间距,可以起到调节沉降的效果,但调节桩长更为明显,在满足稳定及有一定预压期时,适当加大桩间距对总沉降及工后沉降影响不大,设计时可适当放大桩间距,以降低工程造价。

关 键 词:道路工程  软土地基  有限元  塑料套管混凝土桩  沉降

Finite Element Analysis on Settlement of Highway Soft Foundation Reinforced by Plastic Tube Cast-in-place Concrete Pile
Lin Fei,Chen Yonghui,Zhou Xingde. Finite Element Analysis on Settlement of Highway Soft Foundation Reinforced by Plastic Tube Cast-in-place Concrete Pile[J]. Modern Transportation Technology, 2010, 7(3): 8-11
Authors:Lin Fei  Chen Yonghui  Zhou Xingde
Affiliation:(Jiangsu Provincial Communication Planning & Design Institute Co., Ltd, Nanjing 210005, China)
Abstract:In order to study the consolidate mechanisms and deformation features of the soft highway substructure reinforced by plastic tube east-in-place concrete pile (TC pile), the effects of pile length, the distance between piles, the filling height on substructure settlement through finite element method. It learned that when the TC pile didn't punch through the soft soil layer the settlement was big, to decrease the sedimentation and the post-construction settlements the TC pile should be punched through the soft soil layers and enter into the supporting layer about 0.5-1.0 meter. Adjusting the pile separation distance can regulate the post-construction settlement while the tip of the TC pile arrive at the relative hard pan, but it was more effective to adjust the pile length. When the substructure was steady and pre-loaded enlarging piles distances have little influence on the whole settlement and the post-construction settlements, so the distances between the piles can be enlarged properly to decrease the costs of engineering construction.
Keywords:highway engineering  soft foundation  finite element  plastic tube cast-in-place concrete pile  settlement
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号