钢筋混凝土拱桥悬臂浇注施工模型试验研究
引用本文:李晓斌,杨永清,蒲黔辉,刘祖胜.钢筋混凝土拱桥悬臂浇注施工模型试验研究[J].西南交通大学学报,2007,42(5):526-530.
作者姓名:李晓斌  杨永清  蒲黔辉  刘祖胜
作者单位:1. 西南交通大学土木工程学院,四川成都,610031
2. 四川省交通厅公路规划勘察设计研究院,四川,成都,610041
基金项目:西部交通建设科技项目(2003-318-78011)
摘    要:为验证钢筋混凝土拱桥悬臂浇注施工工艺的可行性和安全性,以白沙沟1#大桥为工程背景,进行了悬臂浇注施工全过程模型试验;测试了拱圈变形、控制断面应力和扣索索力,并与有限元法计算结果进行了比较,二者基本相符.结果表明,拱圈在施工过程中是安全的,钢筋混凝土拱桥悬臂浇注施工工艺可行.

关 键 词:钢筋混凝土拱桥  悬臂浇注  索力优化  模型试验
文章编号:0258-2724(2007)05-0526-05
修稿时间:2006-11-08

Model Test of Cantilever Casting Construction of Reinforced Concrete Arch Bridge
LI Xiaobin,YANG Yongqing,PU Qianhui,LIU Zusheng.Model Test of Cantilever Casting Construction of Reinforced Concrete Arch Bridge[J].Journal of Southwest Jiaotong University,2007,42(5):526-530.
Authors:LI Xiaobin  YANG Yongqing  PU Qianhui  LIU Zusheng
Institution:1. School of Civil Eng. , Southwest Jiaotong University, Chengdu 610031, China; 2. Sichuan Province Communication Department Highway Planning, Survey, Design and Research Institute, Chengdu 610041, China
Abstract:In order to demonstrate the feasibility of the construction technique of cantilever casting of a reinforced concrete arch bridge and the rationality of cable force adjustment and construction control,a model test of cantilever casting construction was made by taking the No.1 Baishagou bridge as project background.The displacement of model arch,the stress of control sections and the force of cables were tested.In addition,the test results were compared with calculated results based on the FEM(finite element method),showing reasonable agreement.The research results show that the model arch is safe during the construction,the construction technique of cantilever casting of reinforced concrete arch bridges is feasible,and the method of cable force optimization and adjustment is reasonable.
Keywords:reinforced concrete arch bridge  cantilever casting  optimization of cable force  model test