箱梁预应力束张拉施工技术
引用本文:张成龙.箱梁预应力束张拉施工技术[J].西部交通科技,2011(4):47-49,65.
作者姓名:张成龙
作者单位:中铁十九局集团第五工程有限公司,辽宁,大连,116109
摘    要:文章结合良庆制梁场箱梁预制工程实际,介绍了橡胶抽拔棒及其安装制孔方法,探讨了张拉施工前的注意事项,同时从预张拉、初张拉和终张拉三个阶段阐述了预应力束张拉施工工艺,并提出了相应的张拉施工要点。

关 键 词:张拉施工  注意事项  工艺  施工要点

Drawing and Stretch Construction Technique of Box Beam Pre-stress
ZHANG Cheng-long.Drawing and Stretch Construction Technique of Box Beam Pre-stress[J].Western China Communication Science & Technology,2011(4):47-49,65.
Authors:ZHANG Cheng-long
Institution:ZHANG Cheng-long(China Railway 19 Bureau Group CO.,LTD No.5 Construction Company,Dalian,Liaoning,116109)
Abstract:Combined with the pre-made box beam producing in Liangqing beam manufac-tured yard,the article introduces the rubber drawing bar and its installation method.It also discusses the cautions for drawing and stretch construction.From the perspective of pre-construction,begin and end construction,the technique and keypoints are also pointed out.
Keywords:Drawing and stretch construction  Cautions  Technique  Construction keypoint  