三维测量数据的钢结构虚拟装配过程仿真系统(英文)
作者姓名:Deok Eun Kim  Tuo Han Chen
作者单位:Samin Information System Co.,Ltd.,Busan 612-020,Republic of Korea;Dept.of Naval Architecture and Marine Systems Engineering,Pukyung National University,Busan 608-739,Republic of Korea
基金项目:supported by the Korea Institute of Marine Science & Technology promotion (KIMST)
摘    要:The virtual erection simulation system was explained for a steel structure including ship and ocean plant blocks.The simulation system predicted the erection state to optimize any gap or overlap of blocks based on 3-D measurement data.The blocks were modified(cut) on the basis of the simulation result on the ground before erecting them by crane.The re-cutting process was not required and the blocks were erected into a mother ship speedily.Therefore,the erection time is reduced,increasing the dock turnover.

关 键 词:block  erection  dimensional  accuracy  control  of  ship  block  production  planning  and  scheduling  ship  construction  virtual  simulation  system  steel  structure

A virtual erection simulation system for a steel structure based on 3-D measurement data
Deok Eun Kim,Tuo Han Chen.A virtual erection simulation system for a steel structure based on 3-D measurement data[J].Journal of Marine Science and Application,2012,11(1):52-58.
Authors:Deok Eun Kim  Tuo Han Chen
Institution:Deok Eun Kim1* and Tuo Han Chen2 1.Samin Information System Co.,Ltd.,Busan 612-020,Republic of Korea 2.Dept.of Naval Architecture and Marine Systems Engineering,Pukyung National University,Busan 608-739,Republic of Korea
Abstract:The virtual erection simulation system was explained for a steel structure including ship and ocean plant blocks. The simulation system predicted the erection state to optimize any gap or overlap of blocks based on 3-D measurement data. The blocks were modified (cut) on the basis of the simulation result on the ground before erecting them by crane. The re-cutting process was not required and the blocks were erected into a mother ship speedily. Therefore, the erection time is reduced, increasing the dock turnover.
Keywords:block erection  dimensional accuracy control of ship block  production planning and scheduling  ship construction  virtual simulation system  steel structure