首页 | 本学科首页   官方微博 | 高级检索  
     检索      

桥梁冬季施工方案分析
引用本文:赵福安.桥梁冬季施工方案分析[J].交通标准化,2012(12):84-85.
作者姓名:赵福安
作者单位:石家庄市路桥建设集团有限公司,河北石家庄,050050
摘    要:冬季施工一直是混凝土桥梁施工中的难题.混凝土桥梁的施工单位要在充分考虑气候条件、施工工期、施工质量要求及施工费用等条件下,选择适当的施工方法进行冬季施工,确保混凝土桥梁的质量.

关 键 词:混凝土  桥梁  冬季施工  施工方法

Analysis of Bridge Construction Program in Winter
ZHAO Fu-an.Analysis of Bridge Construction Program in Winter[J].Communications Standardization,2012(12):84-85.
Authors:ZHAO Fu-an
Institution:ZHAO Fu-an (Shijiazhuang Road and Bridge Construction Group Co., Ltd., Shijiazhuang 050050, China)
Abstract:The winter construction is always a difficult problem in the concrete bridge construction. The concrete bridge construction unit should take full account of the conditions, such as climatic conditions, construc- tion duration, quality requirements and costs, etc. They may select the appropriate construction methods for the winter construction to ensure the quality of the concrete bridge.
Keywords:: concrete  bridge  winter construction  construction method
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号