首页 | 本学科首页   官方微博 | 高级检索  
     检索      

预制箱梁混凝土夏季施工的质量控制措施
引用本文:孟德林.预制箱梁混凝土夏季施工的质量控制措施[J].交通标准化,2012(21):91-92.
作者姓名:孟德林
作者单位:河北省高速公路承赤筹建处,河北承德,067000
摘    要:针对混凝土夏季施工的特点和诸多不利因素,应采取必要的防护措施,以保证混凝土的浇筑质量.通过申苏浙皖高速公路浙江段工程预制箱梁施工的研究,总结在高温季节箱梁预制施工中遇到问题和采取的相应措施.

关 键 词:预制箱梁  高温  质量  控制措施

Quality Control Measures of Prefabricated Box Girder Concrete in Summer Construction
MENG De-lin.Quality Control Measures of Prefabricated Box Girder Concrete in Summer Construction[J].Communications Standardization,2012(21):91-92.
Authors:MENG De-lin
Institution:MENG De-lin(Chengchi Preparation and Construction Office of Hebei Expressway,Chengde 067000,China)
Abstract:Considering the characters and many disadvantageous factors of concrete in summer construction,necessary protective measures should be adopted to ensure the quality of concrete pouring.By the study on construction processes of concrete of prefabricated box girder of Shanghai-Jiangsu-Zhejiang-Auhui expressway Zhejiang section,the problems in prefabricated box girder construction during high temperature season and corresponding countermeasures are summarized.
Keywords:prefabricated box girder  high temperature  quality  control measure
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号