首页 | 本学科首页   官方微博 | 高级检索  
     

桥梁顶升更换支座施工技术探讨
引用本文:孙泽良. 桥梁顶升更换支座施工技术探讨[J]. 交通标准化, 2012, 0(19): 69-71
作者姓名:孙泽良
作者单位:新疆一洲路桥工程有限责任公司,新疆库尔勒,841000
摘    要:高速公路的建设营运数十年后,其桥梁支座可能会相继出现橡胶老化、剪切变形等病害问题,采取顶升技术来更换支座是主要的处理手段之一.鉴于此,结合实例来深入探讨桥梁顶升更换支座的详细过程,旨在能为同类工程提供参考.

关 键 词:桥梁施工  桥梁顶升  更换支座  施工监控

Construction Technology for Bearing Replacing of Bridge by Lifting
SUN Ze-liang. Construction Technology for Bearing Replacing of Bridge by Lifting[J]. Communications Standardization, 2012, 0(19): 69-71
Authors:SUN Ze-liang
Affiliation:SUN Ze-liang (Xinjiang Island Road and Bridge Engineering Co., Ltd., Korla 841000, China)
Abstract:Bridge bearings have rubber aging, shear deformation and other problems after operating for decades, using lifting technology to replace the bearing is one of the main processing means. Given this, the pro- cess on replacing the bearing by lifting is discussed in order to provide reference for similar engineering projects.
Keywords:bridge construction  bridge lifting  bearing replacing  construction monitoring
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号