先梁后拱式系杆拱桥吊杆张拉施工控制技术
引用本文:冯向斌.先梁后拱式系杆拱桥吊杆张拉施工控制技术[J].交通标准化,2012(18):55-59.
作者姓名:冯向斌
作者单位:中铁十五局集团有限公司,河南洛阳,471013
摘    要:以格丑沟特大桥为工程背景,通过理论计算、现场监测及其结果分析,形成了一套先梁后拱式系杆拱桥吊杆张拉施工控制技术,对类似桥梁的施工有参考价值.

关 键 词:系杆拱桥  吊杆  张拉  施工控制

Construction Control Technology of Suspender Tension of Tied Arch Bridge Called Beam First and Then Arch
FENG Xiang-bin.Construction Control Technology of Suspender Tension of Tied Arch Bridge Called Beam First and Then Arch[J].Communications Standardization,2012(18):55-59.
Authors:FENG Xiang-bin
Institution:FENG Xiang-bin (China Railway 15th Bureau Group Co., Ltd., Luoyang 471013, China)
Abstract:Taking Gechougou Large Bridge as engineering background, through theoretical calculations, on site monitoring and results analysis, a system of construction control technology of suspender tension for tied arch bridge which is "beam first then arch" is formed. It has referenced value for the construction of the similar bridges.
Keywords:tied arch bridge  suspender  tension  construction control