象山隧道挡水墙爆破拆除
引用本文:赵东波,李红军.象山隧道挡水墙爆破拆除[J].隧道建设,2012,32(5):705-708.
作者姓名:赵东波  李红军
作者单位:(中铁隧道集团有限公司,河南洛阳 471009)
摘    要:象山隧道的混凝土挡水墙和抗剪斜墙与隧道衬砌连成整体,厚度分别为7 m和5 m。为了拆除挡水墙和抗剪斜墙并保证衬砌安全,采用了预留保护层、预钻减震孔、非爆开挖超前导洞、严格控制单段爆破用药量、合理设计爆破参数等技术措施,成功拆除了挡水墙和抗剪斜墙,取得了很好的效果。

关 键 词:隧道  挡水墙  爆破拆除  减震孔  超前导洞  非爆开挖  
收稿时间:2012-04-09
修稿时间:2012-04-23

Case Study on Blasting Demolition of Water-stopping Wall of Xiangshan Tunnel
ZHAO Dongbo,LI Hongjun.Case Study on Blasting Demolition of Water-stopping Wall of Xiangshan Tunnel[J].Tunnel Construction,2012,32(5):705-708.
Authors:ZHAO Dongbo  LI Hongjun
Institution:(China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China)
Abstract:The thicknesses of the concrete water-stopping wall and anti-shearing wall of Xiangshan tunnel are 7 m and 5 m respectively. Countermeasures, including reserving protection layer, drilling vibration-reducing hole, non-blasting pi- lot heading, strict control of the charging quantity of each interval and rational blasting parameter design, are taken in order to demolish the water-stopping wall and the anti-shearing wall and to ensure the safety of the lining. In the end, good result has been achieved.
Keywords:tunnel  water-stopping wall  blasting demolition  vibration-reducing hole  pilot heading  non-blasting ex- cavation