首页 | 本学科首页   官方微博 | 高级检索  
     检索      

断头路打通场景下的路网优化评估
引用本文:何伟涛,王艳东,宫延鹏,赵剑.断头路打通场景下的路网优化评估[J].交通信息与安全,2021,39(6):100-107.
作者姓名:何伟涛  王艳东  宫延鹏  赵剑
作者单位:1.武汉大学测绘遥感信息工程国家重点实验室 武汉 430079
基金项目:国家重点研发计划项目2016YFB0501403
摘    要:针对断头路的存在会降低道路利用率、加剧交通拥堵等问题, 构建了断头路打通在路网结构以及交通分配层面上的优化评估方法。在路网结构层面, 采用社区探测对路网进行划分, 获取社区作为受断头路影响较大的路段组合; 在交通分配层面, 将断头路打通带来的影响量化为路段平均速率的变化, 构造路网阻抗函数作为约束条件, 在社区内部进行断头路打通前后2次交通分配; 通过连续平均算法建立求解算法, 选取2次用户均衡状态的路段平均速率变化百分比作为评价指数。以北京市朝阳区路网为算例进行分析, 结果表明: ①900 pcu出行需求约束下, 断头路打通的平均指数均值小于0.6%, 表明在低负荷区域打通断头路不能带来明显的优化; ②在剩余3组较大出行需求约束下, 打通跨社区断头路的评价指数均值(3.097%, 1.833%, 2.633%)都大于打通社区内断头路(2.077%, 1.785%, 2.041%), 在市政工程中应该优先考虑打通跨社区路段。 

关 键 词:交通规划    断头路    社区探测    交通分配    路段平均速率
收稿时间:2021-06-10

An Evaluation Study of Network Optimization through Connecting Dead-end-roads
HE Weitao,WANG Yandong,GONG Yanpeng,ZHAO Jian.An Evaluation Study of Network Optimization through Connecting Dead-end-roads[J].Journal of Transport Information and Safety,2021,39(6):100-107.
Authors:HE Weitao  WANG Yandong  GONG Yanpeng  ZHAO Jian
Institution:1.State Key Laboratory of Information Engineering in Surveying, Mapping and Remote Sensing, Wuhan University, Wuhan 430079, China2.Beijing Institute of Surveying and Mapping, Beijing 100038, China
Abstract:Dead-end-roads(DERs)are widespread in any city, and their presence can reduce the usage of roads and lead to traffic congestions. However, there are limited quantitative methods to assess the impacts of DERs. A new method is proposed to assess their impacts. At the level of road structure, community detection is used to classify the road network, and analyze the community which greatly affected by responded DERs. At the level of traffic assignment, whether a dead-end-road is opening, two simulations are performed in the community mentioned above. On this basis, the percentage change of the average value in roads' speeds is selected as an evaluation index. Then, this method is varified by a case study of the road network in Chaoyang District, Beijing. The results shows that: ①Under the travel demand of 900 pcu, the mean value of indices is less than 0.6%, indicating that opening DERs in the low-load area cannot bring obvious optimization. ② Under three groups of large travel demand, the mean value of indices of cross-community DERs(3.097%, 1.833%, and 2.633%)are higher than which of intra-community DERs(2.077%, 1.785%, and 2.041%). The opening of cross-community road sections should be given priority in municipal projects. 
Keywords:
本文献已被 万方数据 等数据库收录!
点击此处可从《交通信息与安全》浏览原始摘要信息
点击此处可从《交通信息与安全》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号