首页 | 本学科首页   官方微博 | 高级检索  
     检索      

轨道交通隧道内牵引网感应电压研究
引用本文:周 丹,何治新,艾晓宇,李鲲鹏,曹晓斌.轨道交通隧道内牵引网感应电压研究[J].都市快轨交通,2022,35(2):55-60.
作者姓名:周 丹  何治新  艾晓宇  李鲲鹏  曹晓斌
作者单位:广州地铁设计研究院股份有限公司,广州510010,广州地铁设计研究院股份有限公司,广州510010;西南交通大学电气工程学院,成都611756,西南交通大学电气工程学院,成都611756
摘    要:中国部分城市轨道交通采用工频单相交流制式,以提升列车的运行速度和运输能力.牵引供电系统发生故障时,有可能采用单侧停电抢修方案,如果此时接触网的感应电压过高,将对检修人员造成安全威胁.依据广州地铁22号线设计资料,搭建地铁隧道的仿真模型,计算得到一侧线路停电检修,另一侧线路正常运行时接触网上的感应电压,获得牵引电流、隧道...

关 键 词:城市轨道交通  交流供电  感应电压  检修  接地

Induced Voltage on Overhead Catenary Line in Adjacent Tunnel of Rail Transit
ZHOU Dan,HE Zhixin,AI Xiaoyu,Kunpeng,CAO Xiaobin.Induced Voltage on Overhead Catenary Line in Adjacent Tunnel of Rail Transit[J].Urban Rapid Rail Transit,2022,35(2):55-60.
Authors:ZHOU Dan  HE Zhixin  AI Xiaoyu  Kunpeng  CAO Xiaobin
Institution:Guangzhou Metro Design & Research Institute Co., Ltd.;Guangzhou Metro Design & Research Institute Co., Ltd.,;Guangzhou Metro Design & Research Institute Co., Ltd.,School of Electrical Engineering, Southwest Jiaotong University
Abstract:Some rail transit systems in China adopt a power frequency single-phase AC system to improve the running speed and transportation capacity of trains. When the traction power supply system fails, a one-sided power outage emergency repair scheme may be adopted. If the induction voltage on the catenary is too high, it harms the maintenance personnel. In this study, a simulation model of a subway tunnel was built based on the design data. The induced voltage on the overhead catenary line is obtained when it is cut off for maintenance, and the other side of the line is in regular operation. The influences of the traction current, distance between the tunnels, and other factors on the induced voltage were also determined. It was found that the inductive voltage on the overhead catenary line exceeded the safety level when the single-ended grounding mode was adopted. If the double-ended grounding mode is adopted, it will be reduced to below the safety limit. Based on the above research results, this study proposes that when the subway unilateral power outage maintenance operation is adopted in the AC power supply system, both ends of the maintenance interval must be grounded. The conclusion of this study can be used as a reference for subway management departments to formulate safety measures.
Keywords:urban rail transit  AC power supply  induced voltage  maintenance and repair  grounding
本文献已被 万方数据 等数据库收录!
点击此处可从《都市快轨交通》浏览原始摘要信息
点击此处可从《都市快轨交通》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号