相对标高和绝对标高立模法在虎跳门大桥施工中的应用
引用本文:曾田胜.相对标高和绝对标高立模法在虎跳门大桥施工中的应用[J].公路,2006(8).
作者姓名:曾田胜
作者单位:广东西部沿海高速公路珠海段有限公司 中山市528467
摘    要:为消除温度效应对主梁挠度变化的复杂影响,在虎跳门大桥的施工过程中,针对结构不同的悬臂状态和温度情况,综合采用了绝对标高和相对标高立模法,在实施过程中取得了较好的效果。

关 键 词:虎跳门大桥  施工控制  相对标高法  绝对标高法

Application of Form Erected with Relative Elevation Method and Absolute Elevation Method to Hutiaomen Bridge Construction
ZENG Tian-sheng.Application of Form Erected with Relative Elevation Method and Absolute Elevation Method to Hutiaomen Bridge Construction[J].Highway,2006(8).
Authors:ZENG Tian-sheng
Abstract:To counter the different suspension state and temperate situation of structures, the relative elevation method and the absolute elevation method for erecting form are applied in the construction of Hutiaomen Bridge to removing the tempperature's effect on deflection change of main girder,and the satisfied result is received in the application of practical engineering.
Keywords:Hutiaomen Bridge  construction control  method of relative elevation  method of absolute elevation