首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于Bowtie和RCM的大型海工平台拖航作业风险控制
引用本文:李伟,胡甚平,郭云龙.基于Bowtie和RCM的大型海工平台拖航作业风险控制[J].中国航海,2019(1):63-67.
作者姓名:李伟  胡甚平  郭云龙
作者单位:上海海事大学商船学院;南通航运职业技术学院航海系
基金项目:2015年度江苏省高校科技创新团队资助计划;2019年度江苏省教育厅高校"青蓝工程"优秀骨干教师培养对象资助项目
摘    要:为对平台拖航风险有效地进行识别、分析和控制,提出一种基于领结法(Bowtie)和改进的以可靠性为中心的维修(Reliablity Centered Maintenance, RCM)风险控制方法。在对大型海工平台拖航作业特点进行分析的基础上,运用Bowtie模型对拖航作业系统风险进行辨识,形成初步的风险应对措施,利用失效和影响分析(Failure Mode and Effect Analysis, FMEA)法对系统风险进行量化评价,对风险等级较高的故障模式进行危险与可操作性分析(Hazard and Operability Analysis, HAZOP)分析,并利用逻辑决断的方法,得出相关的风险预控措施及事故缓解措施。经拖航实践应用表明:该方法有助于对拖航作业每一个重要环节的风险进行控制,从而提升拖航作业的安全性。

关 键 词:大型平台  拖航  领结法  以可靠性为中心的维修  风险预控

Risk Control for Large Offshore Platform Towing on Bowtie and RCM
LI Wei,HU Shenping,GUO Yunlong.Risk Control for Large Offshore Platform Towing on Bowtie and RCM[J].Navigation of China,2019(1):63-67.
Authors:LI Wei  HU Shenping  GUO Yunlong
Institution:(Merchant Marine College, Shanghai Maritime University, Shanghai 201306, China;Department of Navigation, Nantong Shipping College, Nantong 226010, China)
Abstract:A new RCM(Reliability Centered Maintenance)method based on Bowtie is proposed for effectively identifying, analyzing and controlling the risks involved in towing large offshore platform. The risks are identified by means of Bowtie model on the basis of the analysis of the characteristics of the large-scale offshore platform. The preliminary risk response measures are formed, and the systemic risk is evaluated quantitatively with FMEA (Failure Mode and Effect Analysis) method. The HAZOP(Hazard and Operability Analysis) analysis is carried out for the fault modes of high risk level. The risk control measures and the mitigation measures are concluded through logical decisions. Real operations show that this method is effective in helping control the risk at every important stage of the towing operation.
Keywords:large offshore platform  towing  Borvite  RCM  risk control
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号