首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高速公路建设管(杆)线拆迁费用估算探究
引用本文:范与李.高速公路建设管(杆)线拆迁费用估算探究[J].城市道桥与防洪,2009(8).
作者姓名:范与李
作者单位:温州市高速公路工程建设总指挥部,浙江温州,32500
摘    要:导致工程超概算的原因很多,如宏观经济政策的变化、不可抗力的影响、工程的变更以及工程可行性研究费用的估算不足等。随着城市化进程的加快,绕城和延伸线等高速公路规划向城市靠近,高速公路建设所需拆迁管(杆)线的数量及拆迁难度随之增大。其拆迁费用的估算,值得探究。该文介绍的有关经验可供类似工程参考。

关 键 词:高速公路  管(杆)线  拆迁费用  估算

Probing into Dismounting Fee Estimation of Construction Pipelines (Poles) in Expressway
Fan Yuli.Probing into Dismounting Fee Estimation of Construction Pipelines (Poles) in Expressway[J].Urban Roads Bridges & Flood Control,2009(8).
Authors:Fan Yuli
Abstract:There are many causes i.e. the variety of macroscopic economic policy, force majeure influence, engineering alteration, and lack estimation of engineering feasibility study fee to lead the over-budgetary estimation of the project. With the speeding up of urbanization course, the planning of expressway around city and extending line is closing to the city. The quantity of pipeline and pole required to dismount for the construction of expressway and the dismounting difficulty are increased with it. It is wort...
Keywords:expressway  pipeline (pole)  dismounting fee  estimation
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号