首页 | 本学科首页   官方微博 | 高级检索  
     

双排桩支护结构优化计算方法分析
引用本文:袁志. 双排桩支护结构优化计算方法分析[J]. 中南公路工程, 2013, 0(2): 206-209
作者姓名:袁志
作者单位:惠州市市政工程勘察设计研究院,广东惠州516002
摘    要:针对深度不大但桩顶位移控制很严的基坑,可以采用加密前排桩,设置单根后排桩的“支点式”双排桩布置方案,文章结合等值梁法、连续墙和连续梁的计算方法,得到了优化后的双排桩计算方式,并运用工程实践,收到了良好的效果。

关 键 词:双排桩  支点式  等值梁法  连续墙  连续梁

Optimized Calculation Method Analysis of Retaining Structure with Double Row Piles
YUAN Zhi. Optimized Calculation Method Analysis of Retaining Structure with Double Row Piles[J]. Central South Highway Engineering, 2013, 0(2): 206-209
Authors:YUAN Zhi
Affiliation:YUAN Zhi (Huizhou Municipal Engineering Design Institute, Huizhou, Guangdong 516002, China)
Abstract:Aiming at the excavations of little depth and the top of the pile displacement control is very strict, applied "fulcrum style "double-row pile layout program by increasing the front row piles and setting the single rear row piles, this paper combined with calculation method of equal value beam meth- od, continuous wall and continuous beam, elaborated the optimized calculation method of double-row piles, and applied engineering practice, received good results.
Keywords:double-row piles  fulcrum style  equal value beam method  continuous wall  contin-uous beam
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号