首页 | 本学科首页   官方微博 | 高级检索  
     

关于高原铁路某隧道敞开式TBM开挖直径的探讨
引用本文:李志军,陈馈,陈桥,周毅,李增,于京波,张啸. 关于高原铁路某隧道敞开式TBM开挖直径的探讨[J]. 隧道建设, 2022, 42(5): 807-816. DOI: 10.3973/j.issn.2096-4498.2022.05.006
作者姓名:李志军  陈馈  陈桥  周毅  李增  于京波  张啸
作者单位:(1. 西南交通大学土木工程学院, 四川 成都 610031; 2. 中铁隧道局集团有限公司, 广东 广州 511458;3. 盾构及掘进技术国家重点实验室, 河南 郑州 450001; 4. 中铁工程装备集团有限公司, 河南 郑州 450016)
摘    要:为探讨高原铁路某隧道不良地质条件下敞开式TBM开挖直径是否适应的问题,结合已建、在建工程存在的问题及施工数据,分析TBM法隧道初期支护变形侵限的原因,且通过对比分析工程地质数据、衬砌参数,认为不良地质条件下TBM护盾收缩及初期支护体系形成支护能力周期长是造成初期支护侵限的主要原因。预测当TBM开挖直径为10.2 m时,该高原铁路隧道TBM段Ⅲ级围岩中等及以上岩爆段、Ⅳ级围岩(节理密集带)、Ⅴ级围岩(蚀变岩)存在初期支护侵限的风险。提出如下建议: 1)设计TBM开挖直径时考虑护盾收缩量; 2)在强烈岩爆段、节理密集带、蚀变岩等情况下,采用钢管片施作初期支护以提供临时支撑,缩短支护能力形成周期,并将TBM开挖直径适当增大为钢管片安装预留空间。


Discussion on Open TBM Excavation Diameter of aPlateau Railway Tunnel
LI Zhijun,CHEN Kui,CHEN Qiao,ZHOU Yi,LI Zeng,YU Jingbo,ZHANG Xiao. Discussion on Open TBM Excavation Diameter of aPlateau Railway Tunnel[J]. Tunnel Construction, 2022, 42(5): 807-816. DOI: 10.3973/j.issn.2096-4498.2022.05.006
Authors:LI Zhijun  CHEN Kui  CHEN Qiao  ZHOU Yi  LI Zeng  YU Jingbo  ZHANG Xiao
Affiliation:(1.School of Civil Engineering,Southwest JiaotongUniversity,Chengdu 610031,Sichuan, China;2.China Railway Tunnel Group Co.,Ltd.,Guangzhou511458,Guangdong,China;3.State Key Laboratory of Shield Machine and BoringTechnology,Zhengzhou 450001,Henan,China;4.China Railway Engineering Equipment Group Co.,Ltd.,Zhengzhou 450016,Henan,China)
Abstract:To investigate the adaptability of an open tunnelboring machine(TBM) excavation diameter to unfavorable geological conditions inplateau areas, the reasons for limit invasion caused by primary supportdeformation in the TBM tunnel are analyzed using existing problems andconstruction data from the completed andunder construction projects. The above mentioneddata and lining parameters are compared with those in the case study of aplateau railway tunnel. It is discovered that TBM shield shrinkage and thesupport capacity formed using primary support system are the key causes oflimit invasion for primary support under unfavorable geological conditions.Furthermore, when the TBM excavation diameter reaches 10.2 m, the sections withmedium and above rockburst ingrade Ⅲ surrounding rock, the joint intensive zone of grade Ⅳ surrounding rock, and the altered rock area of grade Ⅴ surrounding rock are expected to be prone to limit invasion.Therefore, the following suggestions are made: (1) Shield shrinkage should beconsidered when designing TBM excavation diameter. (2) Steel segment canprovide temporary support for primary support in strong rockburst sections,dense joint zone, and altered rock and shorten the formation time of supportcapacity; The TBM excavation diameter should be increased to provide space forsteel segment installation.
Keywords: railway tunnel  open TBM,excavation diameter,primary support,limit invasion,
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏