预应力混凝土连续弯箱梁桥同步顶升纠扭施工
引用本文:陈历耿,吴毅彬,张鸿章,李铁军.预应力混凝土连续弯箱梁桥同步顶升纠扭施工[J].世界桥梁,2012(3):72-76.
作者姓名:陈历耿  吴毅彬  张鸿章  李铁军
作者单位:上海颖川加固工程技术有限公司;同济大学结构工程与防灾研究所;上海浦发建设工程管理有限公司
基金项目:上海市科研计划课题项目(1104H105000)
摘    要:既有预应力混凝土连续弯箱梁桥在运营阶段经常出现支座变形、脱空及梁体扭转、偏位等病害,使桥梁结构受力趋于不利状态。以上海市一座匝道桥梁加固处理为对象,在对该桥病害原因进行分析的基础上,介绍采用PLC液压同步技术对桥梁进行整体同步顶升(不对称布顶)更换支座、纠扭、增设支座调整扭矩与支座反力等改造措施。实施结果表明:同步顶升控制系统较好地保证了顶升位移的精度;支座反力测定简便、可靠;病害弯桥基本恢复到原设计状态,实施效果良好。

关 键 词:预应力混凝土桥  连续弯箱梁  PLC液压同步技术  同步顶升  纠扭  施工

Torsion Correction in Synchronous Jack-up Construction of Prestressed Concrete Continuous Curved Box Girder Bridge
CHEN Li-geng,WU Yi-bin,ZHANG Hong-zhang,LI Tie-jun.Torsion Correction in Synchronous Jack-up Construction of Prestressed Concrete Continuous Curved Box Girder Bridge[J].World Bridges,2012(3):72-76.
Authors:CHEN Li-geng  WU Yi-bin  ZHANG Hong-zhang  LI Tie-jun
Institution:1.Shanghai Yingchuan Reinforce Technical Co.,Ltd.,Shanghai 201102,Shanghai 201102,China;2.Research Institute of Structural Engineering and Disaster Reduction,Tongji University,Shanghai 200092, China;3.Shanghai Pufa Construction Management Co.,Ltd.,Shanghai 201102,China)
Abstract:The existing prestressed concrete continuous curved box girder bridge often suffers from bearing deformation,bearing hanging in the air,girder torsion and offsetting in operation stage,and the mechanical behavior of bridge structure tends to be in unfavorable condition.The strengthening of an interchange in Shanghai was taken as study object.Based on the analysis of the causes leading to those damages,the PLC hydraulic synchronization technique was applied to carry out the overall and synchronous jacking up and a series of improvement measures of changing bearings,correcting torsion,adding bearing tuning torsion and testing the bearing reaction force.The results of the strengthening indicate that the synchronous jack-up control system well guarantees the accuracy of the jack-up displacement;the testing of the bearing reaction force is simple and reliable;the deteriorating curved bridge is basically restored to its original design condition,and the strengthening effect is sound.
Keywords:prestressed concrete bridge  continuous curved box girder  PLC hydraulic synchronization technique  synchronuous jack-up  torsion correction  construction