首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅谈东兰110kV变电站进线及排管工程穿西上澳塘涉河论证
引用本文:胡振栋.浅谈东兰110kV变电站进线及排管工程穿西上澳塘涉河论证[J].城市道桥与防洪,2021(6):192-194.
作者姓名:胡振栋
作者单位:上海嘉定水务工程设计有限公司,上海市202009
摘    要:就具体项目穿河构筑物防汛影响专项论证的必要性进行了分析,分别对施工期和使用期作了涉河防汛安全影响研究,利用有限元软件分析工程施工期对周边防汛设施的影响,并针对该穿河构筑物施工期和使用期存在的防汛安全隐患提出了合理化建议,最终给出了涉河论证的结论.

关 键 词:涉河论证  穿河构筑物  防汛设施
收稿时间:2021/3/28 0:00:00

Brief Discussion of River Demonstration on Donglan 110kV Substation Incoming Line and Pipe Laying Project Crossing West Shangaotang River
HU Zhendong.Brief Discussion of River Demonstration on Donglan 110kV Substation Incoming Line and Pipe Laying Project Crossing West Shangaotang River[J].Urban Roads Bridges & Flood Control,2021(6):192-194.
Authors:HU Zhendong
Abstract:The necessity of the special demonstration on the flood control effect of the structure crossing river is analyzed. The influence on the safety of river flood control during the construction period and use period is studied respectively. The finite element software is used to analyze the influence of engineering construction period on the surrounding flood control facilities. The rationalization proposal for the potential safety hazard of flood control existing in the construction period and use period of this structure crossing river is put forward. Finally, the conclusion on the river demonstration is given.
Keywords:river demonstration  structure crossing river  flood control facilities
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《城市道桥与防洪》浏览原始摘要信息
点击此处可从《城市道桥与防洪》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号