组合梁斜拉桥桥面板湿接缝施工探讨
引用本文:杨天伟.组合梁斜拉桥桥面板湿接缝施工探讨[J].城市道桥与防洪,2011(10):89-91,9.
作者姓名:杨天伟
作者单位:中交一公局厦门工程有限公司,福建厦门,361021
摘    要:桥面湿接缝混凝土施工面积大,作业时间跨度长,防止裂缝的产生是项目施工解决的重点问题。该文以某工程为例,对浇筑试验段,进行体外试验,完全模拟现场的施工环境,总结出施工中控制的关键因素,进而在实际的湿接缝浇筑中加以实施,取得了良好的效果。

关 键 词:甬江组合梁斜拉桥  桥面板湿接缝  施工总结

Discussion on Wet Joint Construction of Deck Slab for Combined Beam Cable-stayed Bridge
Yang Tianwei.Discussion on Wet Joint Construction of Deck Slab for Combined Beam Cable-stayed Bridge[J].Urban Roads Bridges & Flood Control,2011(10):89-91,9.
Authors:Yang Tianwei
Institution:Yang Tianwei
Abstract:It is an important problem to solve the cause of cracks in the project construction because of the deck wet joint concrete construction area large and the construction time long.Taking a project as an example,the article describes the in-vitro-tests of the poured tested section and the construction environment of fully simulated field,and sums up the key control factors in the construction so as to implement in the practical wet joint pouring and to obtain the good effect.
Keywords:Yongjiang River Combined Beam Cable-stayed Bridge  wet joint of deck slab  construction summarization  