首页 | 本学科首页   官方微博 | 高级检索  
     检索      

钢箱系杆拱桥先拱后梁法施工控制
引用本文:李永君.钢箱系杆拱桥先拱后梁法施工控制[J].城市道桥与防洪,2011(7):147-150,153,14.
作者姓名:李永君
作者单位:上海市政工程设计研究总院(集团)有限公司,上海市,200092
摘    要:上海市耀龙路桥主桥为主跨152 m下承式钢箱提篮系杆拱桥。以该桥为背景,介绍了系杆拱桥先拱后梁法的施工过程以及施工控制方法,为类似工程提供参考。

关 键 词:系杆拱桥  先拱后梁法  施工控制  耀龙路桥

Construction Control of Steel Box Bowstring Arch Bridge by Pre-arch and Post-beam Method
Li Yongjun.Construction Control of Steel Box Bowstring Arch Bridge by Pre-arch and Post-beam Method[J].Urban Roads Bridges & Flood Control,2011(7):147-150,153,14.
Authors:Li Yongjun
Abstract:The main bridge of Shanghai Yaolong Road Bridge is a through steel box X-type bowstring arch bridge with 152-m span.The article introduces the construction process of bowstring arch bridge by the pre-arch and post-beam method and its construction control method according to the background of this bridge,which can be referred for the similar projects.
Keywords:bowstring arch bridge  pre-arch and post-beam method  construction control  Yaolong Road Bridge
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号