首页 | 本学科首页   官方微博 | 高级检索  
     检索      

港城路横断面设计的主要影响因素分析
引用本文:胡慧红.港城路横断面设计的主要影响因素分析[J].城市道桥与防洪,2011(7):74-75,9.
作者姓名:胡慧红
作者单位:上海浦东建筑设计研究院有限公司,上海,200136
摘    要:外高桥地区的港城路作为长江西路隧道浦东的对接工程,有其独特的交通使命。该文通过对港城路现状建设条件、规划要求,以及交通需求进行分析论证,提出了有利于近远期结合的横断面方案,减少远期废弃工程。

关 键 词:横断面设计  影响因素  合流污水箱涵  近远期结合  上海市

Analysis on Main Influence Factors of Cross Section Design of Gangcheng Road
Hu Huihong.Analysis on Main Influence Factors of Cross Section Design of Gangcheng Road[J].Urban Roads Bridges & Flood Control,2011(7):74-75,9.
Authors:Hu Huihong
Abstract:Gangcheng Road of Waigaoqiao Area taken as the connecting project of Changjiang Road(W) with Pudong has its typical traffic mission.The article analyzes and demonstrates the status construction condition,planning requirement and traffic demand of Gangcheng Road,puts forward the cross section scheme favorable for the combination of the short term with the long term and the decreasing of the long-term waste projects.
Keywords:cross section design  influence factor  combined sewage box culvert  short-term and long-term combination  Shanghai
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号