首页 | 本学科首页   官方微博 | 高级检索  
     检索      

暖棚法在高墩0#块冬季施工的应用
引用本文:李俊杰,王炜.暖棚法在高墩0#块冬季施工的应用[J].城市道桥与防洪,2011(9):137-139,325.
作者姓名:李俊杰  王炜
作者单位:中铁十六局集团有限公司,北京,100051
摘    要:该文介绍葫芦河特大桥主墩0#块冬季施工方法,对西北严寒地区混凝土生产、运输、施工、养护等成功的经验进行了总结。提出采用"暖棚保温、管道覆盖、暖棚养护"法进行混凝土施工是一种较好的方法。

关 键 词:特大桥高墩0#块  混凝土  冬季施工  陕西省

Application of Warm-shed Method in Winter Construction of High-pier 0# Section
Li Junjie,Wang Wei.Application of Warm-shed Method in Winter Construction of High-pier 0# Section[J].Urban Roads Bridges & Flood Control,2011(9):137-139,325.
Authors:Li Junjie  Wang Wei
Institution:Li Junjie,Wang Wei
Abstract:The article introduces the winter construction method of the main pier 0# section of Hulu River Bridge,sums up the successful experience in the manufacture,transportation,construction and cure of concrete in the northwest bitter cold regions,and puts forward that the method ofwarm-shed heat insulation,pipe covering and warm-shed curing is a better method for the concrete construction.
Keywords:high-pier 0# section of over-long bridge  concrete  winter construction  Shanxi Province  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号