青草沙输水隧道盾构施工期力学性能分析
引用本文:杨方勤.青草沙输水隧道盾构施工期力学性能分析[J].城市道桥与防洪,2011(8):269-272,8.
作者姓名:杨方勤
作者单位:上海长江隧桥建设发展有限公司,上海市,201209
摘    要:盾构法隧道施工过程中浅覆土区上浮、最大覆土处隧道同步注浆附加应力、千斤顶对管片集中应力等问题是关系到隧道施工质量和结构安全的关键节点。以青草沙水源地原水工程输水隧道为依托工程,简述了其施工过程中的浅覆土区隧道上浮、最大覆土处隧道同步注浆压力、千斤顶压力等工况,并介绍了隧道结构安全性评估及其结果,提出了相应技术措施,可为类似工程提供参考。

关 键 词:盾构法隧道  浅覆土区上浮  同步注浆附加应力  千斤顶对管片集中应力

Mechanism Performance Analysis of Shield Construction Period for Qingcaosha Water Conveying Tunnel
Yang Fangqin.Mechanism Performance Analysis of Shield Construction Period for Qingcaosha Water Conveying Tunnel[J].Urban Roads Bridges & Flood Control,2011(8):269-272,8.
Authors:Yang Fangqin
Institution:Yang Fangqin
Abstract:The issues of the narrow covered soil area to float up,the maximum additional stress of synchronous grouting of tunnel at the covered soil area and the centralized stress of jack on the segments in he course of the tunnel construction by shield are the key nodes related to the construction quality of tunnel and the security of structure.Based on the water conveying tunnel of Qingcaosha Water Source Raw Water Project,the article briefly describes the working states of the tunnel floating up in the narrow cov...
Keywords:tunnel construction by shield process  floating up of narrow covered soil area  additional stress of synchronous grouting  centralized stress of jack on segment  