首页 | 本学科首页   官方微博 | 高级检索  
     


Opportunistic preventive maintenance optimization for multi-unit series systems with combing multi-preventive maintenance techniques
Authors:Xiao-jun Zhou  Zhi-qiang Lu  Li-feng Xi  Jay Lee
Affiliation:[1]Department of Industrial Engineering, Shanghai Jiaotong University, Shanghai 200240, China [2]University of Cincinnati, Cincinnati OH 45221-0072, Ohio, USA
Abstract:This paper proposes a dynamic opportunistic preventive maintenance (PM) optimization policy for multi-unit series systems by integrating multi PM techniques. Two PM techniques, periodic PM and sequential PM, are considered. Whenever one of the units reaches its reliability threshold, a PM action has to be performed on that unit. At that time the whole system has to be stopped and PM opportunities arise for the other units of the system. An optimal PM practice is determined by maximizing the short-term cumulative opportunistic maintenance (OM) cost savings for the whole system. Numerical examples are given to show how this approach works. Finally, a comparison between the proposed PM policy and the other policies is given.
Keywords:
本文献已被 CNKI 维普 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号