首页 | 本学科首页   官方微博 | 高级检索  
     检索      

EPB盾构泡沫系统设计缺陷与改进
引用本文:张成.EPB盾构泡沫系统设计缺陷与改进[J].铁道建筑技术,2009(1):54-56,68.
作者姓名:张成
作者单位:中铁十一局集团有限公司,武汉,430071
摘    要:通过对现有EPB盾构在掘进过程中泡沫系统存在的缺陷进行分析与研究,提出了详细的改进设计思路与措施,从而极大地降低了土压平衡盾构在掘进过程中发生堵塞的概率,提高了盾构的掘进速度,具有一定的实用和推广价值。

关 键 词:EPB盾构  泡沫系统  设计改进

Design Defects and Improvement of EPB Shield TBM Foam System
Zhang Cheng.Design Defects and Improvement of EPB Shield TBM Foam System[J].Railway Construction Technology,2009(1):54-56,68.
Authors:Zhang Cheng
Institution:Zhang Cheng (China Railway 11^th Bureau Group Co. Ltd. , Wuhan 430071, China)
Abstract:Through analysis and study on the present foam system defects of EPB Shield TBM during its tunneling, the au- thor brings up a detailed improvement plan and measures. This will greatly reduce foam system blocks during EPB Shield TBM tunneling, increase the advance speed, and has certain practical and promotional values.
Keywords:EPB Shield TBM  foam system  design improvement
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号