深埋高地应力隧道不同支护时机求解方法对比研究
引用本文:蒋长伟,陈子全,汪波,李天胜,周子寒,包烨明.深埋高地应力隧道不同支护时机求解方法对比研究[J].隧道建设,2023,43(1):119-130.
作者姓名:蒋长伟  陈子全  汪波  李天胜  周子寒  包烨明
作者单位:(1. 西南交通大学 交通隧道工程教育部重点实验室, 四川 成都〓610031; 2. 中铁十二局集团有限公司, 山西 太原〓030024)
摘    要:为确定深埋高地应力隧道的合理支护时机,提高支护结构质量,降低支护成本,依托某高原深埋高地应力隧道,采用安全系数法、位移增量法和塑性区法分别求解支护结构的合理支护时机,并对比分析不同支护时机求解方法的适用性。

关 键 词:深埋高地应力隧道    支护时机    安全系数法    位移增量法    塑性区法  

Comparative Analysis of Results of Various Methods to Determine Reasonable Support Timings of Deep Buried Tunnels with High Ground Stress
JIANG Changwei,CHEN Ziquan,WANG Bo,LI Tiansheng,ZHOU Zihan,BAO Yeming.Comparative Analysis of Results of Various Methods to Determine Reasonable Support Timings of Deep Buried Tunnels with High Ground Stress[J].Tunnel Construction,2023,43(1):119-130.
Authors:JIANG Changwei  CHEN Ziquan  WANG Bo  LI Tiansheng  ZHOU Zihan  BAO Yeming
Institution:(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031, Sichuan, China; 2. China Railway 12th Bureau Group Co., Ltd., Taiyuan 030024, Shanxi, China)
Abstract:To rationally determine the support timing of deep buried tunnels with high ground stress, improve the support structure quality, and reduce the support cost, a case study is conducted on a deep buried plateau tunnel with high ground stress. Safety factor, displacement increment, and plastic zone methods are employed to determine the reasonable support timing of the support structure, and the applicability of each method is analyzed and compared. The results reveal the following. (1) The distribution laws of cave wall yield calculated by the three methods agree, it is easier to yield at the crown and invert than at the waist and foot. (2) The results of support timings by the various methods differ; under the same buried depth, the safety distance obtained by the safety factor method is greater than that obtained by the plastic zone and displacement increment methods. The engineering analogy shows that the plastic zone and displacement increment methods are more conservative than the safety factor method; thus, the safety factor method is recommended when determining the support timing.
Keywords: