首页 | 本学科首页   官方微博 | 高级检索  
     检索      

苏通大桥超长斜拉索主动式外置阻尼器
引用本文:应明.苏通大桥超长斜拉索主动式外置阻尼器[J].现代交通技术,2008,5(4):37-38.
作者姓名:应明
作者单位:江苏省苏通大桥建设指挥部,江苏,南通,226009
摘    要:苏通大桥地处长江入海口,其跨径为1088m,由于受季风等气候条件的影响,使得斜拉索振动成为一个必须解决的工程难题,通过在斜拉索锚固端附近横向安装机械阻尼器以起到减振效果。文章主要介绍了斜拉索减振阻尼器的结构及减振机理。

关 键 词:苏通大桥  斜拉索  外置阻尼器  减振机理

Damping Mechanism for Active External Damper on Extra-long Stayed Cable of Sutong Bridge
Ying Ming.Damping Mechanism for Active External Damper on Extra-long Stayed Cable of Sutong Bridge[J].Modern Transportation Technology,2008,5(4):37-38.
Authors:Ying Ming
Institution:Ying Ming (Jiangsu Sutong Bridge Construction Commanding Department, Nantong 226009, China)
Abstract:Sutong bridge is located in the estuary of Yangtze river with the main span of 1088 meter. Because of the effects of monsoon climate, stayed cable vibration is a project difficulty which has to be solved. One of the most vibration common damping measures is to install mechanical damping device near the anchorage zone of stayed cable. This paper introduces the structure and vibration damping mechanism of the damping.
Keywords:Sutong bridge  stayed cable  external damper  damping mechanism
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号