首页 | 本学科首页   官方微博 | 高级检索  
     

高速公路瓶颈区域可变限速阶梯控制方法
引用本文:杨庆芳,马明辉,梁士栋,李志林. 高速公路瓶颈区域可变限速阶梯控制方法[J]. 西南交通大学学报, 2015, 28(2): 354-360. DOI: 10.3969/j.issn.0258-2724.2015.02.023
作者姓名:杨庆芳  马明辉  梁士栋  李志林
作者单位:吉林大学汽车动态模拟国家重点实验室;吉林大学交通学院
基金项目:国家科技支撑计划资助项目(2014BAG03B03);山东省省管企业科技创新项目(20122150251-5)
摘    要:针对高流量条件下高速公路主线瓶颈路段交通流运行态势恶劣导致通行效率降低的问题,从高速公路瓶颈路段交通流时空特性出发,对元胞传输模型进行扩展,使其能够对瓶颈路段和可变限速条件下交通流运行情况进行描述;在此基础上,构建可变限速控制模型,并采用阶梯限速控制方法对主线交通流进行控制,防止限速路段车辆排队上溯影响上游匝道车辆的正常通行.算例仿真结果表明:本文提出的瓶颈区域可变限速阶梯控制方法能够有效缩短车辆行程时间,在可变限速条件下,与无控制和仅单路段主线控制相比,车均延误分别减少了13.78%和1.60%. 

关 键 词:高速公路   瓶颈区域   可变限速控制   元胞传输模型   优化控制模型
收稿时间:2014-06-02

Stair-Like Control Strategies of Variable Speed Limit for Bottleneck Regions on Freeway
YANG Qingfang;MA Minghui;LIANG Shidong;LI Zhilin. Stair-Like Control Strategies of Variable Speed Limit for Bottleneck Regions on Freeway[J]. Journal of Southwest Jiaotong University, 2015, 28(2): 354-360. DOI: 10.3969/j.issn.0258-2724.2015.02.023
Authors:YANG Qingfang  MA Minghui  LIANG Shidong  LI Zhilin
Affiliation:YANG Qingfang;MA Minghui;LIANG Shidong;LI Zhilin;State Key Laboratory of Automotive Simulation and Control,Jilin University;College of Transportation,Jilin University;
Abstract:The traffic flow operation at bottleneck sections on freeway mainlines is usually deteriorated by heavy traffic load, resulting in an increase in travel time and a decrease in traffic efficiency. By analyzing the space-time characteristics of the traffic flow at bottleneck sections on freeway mainlines, the cell transmission model was expanded to describe the traffic flow in the bottleneck area under variable speed limit (VSL) control. On this basis, a VSL control model for bottleneck region was established, and stair-like strategies were proposed to prevent the long queue from interrupting the vehicles operation at upstream on-and off-ramps. The proposed methods were tested through a case study, and the results demonstrate that the proposed stair-like strategies for VSLs can effectively reduce the travel time and decrease the average delay. Compared with no control and the strategy of using mainline control on single sections, the proposed strategies can reduce the average delay by about 13.78% and 1.60%, respectively. 
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《西南交通大学学报》浏览原始摘要信息
点击此处可从《西南交通大学学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号