首页 | 本学科首页   官方微博 | 高级检索  
     

冻结法联络通道工程前期阶段风险管控——以福州市轨道交通2号线紫阳站—五里亭站区间超长联络通道及泵站冻结工程为例
引用本文:王书磊,管攀峰,丁国胜. 冻结法联络通道工程前期阶段风险管控——以福州市轨道交通2号线紫阳站—五里亭站区间超长联络通道及泵站冻结工程为例[J]. 隧道建设, 2020, 40(Z1): 258-265. DOI: 10.3973/j.issn.2096-4498.2020.S1.033
作者姓名:王书磊  管攀峰  丁国胜
作者单位:(1. 上海市隧道工程轨道交通设计研究院, 上海 200235; 2. 福州地铁集团有限公司, 福建福州 350000)
摘    要:冻结法联络通道工程是自身风险工程,为弥补联络通道冻结法工程施工之前(前期阶段)风险管控方面的缺失,以风险管控为主线,从工程技术角度对联络通道冻结工程的风险源识别与风险等级评价进行分析,提出减小或规避联络通道冻结工程风险的技术措施,包括: 1)合理选择联络通道的位置,尽量避开重大环境风险和工程地质风险; 2)适当增加联络通道处钢管片的数量,增强隧道结构整体强度和抵御风险的能力; 3)对联络通道前后一定范围的隧道管片背后进行二次注浆,适当加固地层; 4)优化联络通道及泵站的结构尺寸,以利于冻结施工; 5)合理进行冻结法加固专项设计,避免出现冻结薄弱面。

关 键 词:冻结法   联络通道   风险管控   前期阶段   风险评价  

Risk Management in Early Stage of Connection Gallerywith FreezingMethod: a Case Study on Freezing Project of Super longConnection Gallery and Pump Station on Ziyang Station WulitingStation of FuzhouRail Transit Line 2
WANG Shulei,GUAN Panfeng,DING Guosheng. Risk Management in Early Stage of Connection Gallerywith FreezingMethod: a Case Study on Freezing Project of Super longConnection Gallery and Pump Station on Ziyang Station WulitingStation of FuzhouRail Transit Line 2[J]. Tunnel Construction, 2020, 40(Z1): 258-265. DOI: 10.3973/j.issn.2096-4498.2020.S1.033
Authors:WANG Shulei  GUAN Panfeng  DING Guosheng
Affiliation:(1.Shanghai Tunnel Engineering & Rail TransitDesign and Research Institute, Shanghai 200235, China; 2.Fuzhou Metro Group Co.,Ltd., Fuzhou 350000,Fujian, China)
Abstract:The connection gallery with freezing method is a self riskproject, and there is not any risk management measures for early stage ofconnection gallery with freezing method. Hence, the risk source identificationand risk level evaluation of the connection gallery with freezing method areanalyzed. The technical measures that can reduce or avoid the risk of theconnection passage with freezing method are proposed, which include: (1) Thelocation of the connection gallery should be rationally selected by avoidingareas with serious environmental and geological risks. (2) The number of steelpipe pieces at the connection gallery should be appropriately increased toenhance the overall strength of the tunnel structure and the ability to resistrisks. (3) The secondary grouting should be carried out behind segments aheadof and behind connection gallery, and the ground should be reinforced. (4) Thestructural dimensions of the connection galley and pump station should beoptimized to facilitate freezing construction. (5) The special design offreezing method reinforcement should be rationally carried out to avoidfreezing weak surface.
Keywords:freezing method   connection gallery   risk management  early stage   risk evaluation  
本文献已被 CNKI 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号